a chronicle of the Engerts' house-building adventure
The foundation walls are scheduled to be poured tomorrow, but here are some pics I took today. This pic is of the foundation footings covered with hay to keep them insulated.
This pic is taken from the far side of the driveway looking at where the house will be. The flat area around the house is where the septic tank and leachbed are. The uphill area to the far right of the foundation is where the ledge is, which will lead up to the high (back) side of the house.
This shows the driveway from the top looking down to the road.
Here's a shot of the foundation footings looking down from the far side of the house (on top of the ledge). This where the back/upper door and yard will be.




This seeming disaster is the most beautiful thing I have seen in a long time!! It's so nice to see all of our hard work finally coming to fruition. The house will sit to the left of the excavator in the last picture. We have a partial driveway and a lot of trees have come down. Met with the concrete guy this morning and we'll have a foundation poured next week. Hard to believe! I can't wait to see it and walk on it, I'll probably cry! So far no hiccups although we will not be able to have our water hooked up until May 1st but that should work out just fine. We're psyched!!